Z1DA--Request for SF 330 Submissions - AE Correct Cantilever - Project No. 610A4-25-222 at US Dept of Veterans Affairs NIHCS Ft Wayne
Veterans Affairs · 250-NETWORK CONTRACT OFFICE 10 (36C250)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25026R0017 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
General Program Guide, PG-08-15, Volume C Page 4 April 1995 Fort Wayne AE SOW Page 1 STATEMENT OF WORK 610A4-25-222 Correct Cantilever Near MRI Entrance (Building 1) 1. Scope of Work The Architect/Engineer (A/E) firm shall furnish professional services for 100% design Correct Cantilever Near MRI Building at VA Northern Indiana Health Care System, Fort Wayne Campus, 2121 Lake Avenue, Fort Wayne, IN 46805-5100. The design will include Schematic Design, Design Development, Construction/Bid Documents per the A/E Design Submission Instructions Document, Construction Administration Services, Technic… (show all)
al Specifications and Cost Estimates. This project will investigate the structural damage on the cantilever to the entrance of Building 1 near the MRI Building and provide a design to correct the deficiencies noted. Review existing electrical, water, HVAC, and Stem piping that currently flow under the existing slab. Repair of existing cracks due to settlement of foundation and correction of exposed metal rebar.� Design a support system under cantilever. The Schematic Design shall include a comprehensive study, inspection, and report of the existing project area conditions, which shall include HVAC, electrical, architectural components, plumbing, fire protection, asbestos, etc. A/E shall provide a preliminary construction duration period for planning purposes. This information shall be communicated to all bidders for their review and inclusion within their bids. It shall be communicated within the bid documents that the contractor will be required to review and provide any concerns regarding the projected construction duration. The project is to provide all necessary modification and additions to the VA NIHCS existing building structure. mechanical, electrical, information technology, fire suppression, and plumbing work as necessary for a functional design. A/E will be responsible for complete functional design and provide biddable documents meeting all the requirements. The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management. It is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. VA additionally through the documents on the TIL has adopted the latest edition of the following codes and standards (but not limited to): Occupational, Safety and Health Administration (OSHA) Standards International Building Code (IBC) National Electrical Code (NEC) NFPA 101 Life Safety Code National Fire Protection Association (NFPA) Codes, except for NFPA 5000 and NFPA 900 National Standard Plumbing Code (NSPC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1 ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping International Plumbing Code (IPC) Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities Building Code Requirements for Reinforced Concrete, American Concrete Institute (ACI 318 2) and Commentary (ACI 318 R2) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2005 (EPAct)Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1 DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435 Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1 Safety Standard for Refrigeration Systems ASHRAE Standard 15 U.S. National CAD Standard Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. Designs for construction must produce a complete and usable facility or improvement when constructed.� VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project.� In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately unless directed otherwise by the VA. Equipment that can be part of the design includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00. The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence. The project is to provide all necessary modifications and additions to VA NIHCS existing building structure, mechanical, electrical, and plumbing work. A/E shall be responsible for reviewing existing conditions to locations planned for development. Existing drawings of are on file at the VA NIHCS for review by the A/E. Access to files shall be coordinated with the COR. The AE will employ a third-party construction cost estimator. The cost estimator is to be a separate, independent, un-biased and non affiliated entity sub-contracted by the A/E. The A/E may not use their own personnel to complete any requirements stated within the Cost Manual.� All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2020 or the latest version available to VA NIHCS, Fort Wayne Campus. The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the Fort Wayne VAMC Master Record Drawing pending facility expertise). The deliverable model at the DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase. Architectural/Interior Design Square Footage/Volume including Room Names and Numbers Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition) Architectural Schedules Walls and Curtain Wall Sizes, Shapes, and Material Data Doors Windows Louvers Roof Floors Ceilings Vertical Circulation Architectural Specialties and Woodwork Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms) General Signage Schedules Furniture Equipment Structural Foundations Shafts and Pits Mechanical HVAC Plumbing Electrical/Telecommunications Power and Lighting Steam Distribution Nurse Call System Asbestos/ Hazard Material Info Security System Information (Access Controls, Security Cameras, Panic Alarms, Overhead Paging) Exterior Building
Who won similar work
45 award notices on SAM.gov in the last 24 months. Matched by: Same office (250-NETWORK CONTRACT OFFICE 10 (36C250)), same product/service code (PSC) Z1DA.
Single-winner award sizes (45): middle half $186K to $2.6M, median $490K; range $18K to $30.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CALVARY CONTRACTING INC | 6 | $5.3M | Jun 25, 2026 |
| ARMCORP CONSTRUCTION INC | 4 | $32.4M | Sep 16, 2026 |
| CAVU CONSULTING LLC | 3 | $10.0M | Sep 16, 2026 |
| JAB GENERAL CONTRACTOR LLC | 3 | $525K | Apr 4, 2025 |
| VETERANS CONTRACTING, INC. | 2 | $12.7M | Aug 14, 2026 |
| MGI, INC. | 2 | $10.4M | Sep 24, 2025 |
| AmeriTech Contracting LLC | 2 | $2.2M | Jan 7, 2025 |
| N-OVATION TECHNOLOGY GROUP LLC | 2 | $870K | Sep 10, 2026 |
| J & G SOLUTIONS LLC | 2 | $479K | Apr 3, 2026 |
| VETERAN BUILDERS CORP | 2 | $442K | Sep 9, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Oct 9, 2026DANIELS BUILDING CO INC$571KZ1DA--Replace Roofing B-1W 506-26-201No listed company matched (Materiality N/A)
- Oct 7, 2026ELEVEN BRAVO GROUP, LLC$38KRepair CARES Tower 6th Floor Cleveland VA Medical Center, Cleveland, OHNo listed company matched (Materiality N/A)
- Oct 6, 2026IONIC CONTRACTORS LLC$87KFire Suppression Survey at the Cleveland VA Medical CenterNo listed company matched (Materiality N/A)
- Sep 16, 2026ARMCORP CONSTRUCTION INC$30.0MZ1DA--Project No. 610A4-26-500 - Fort Wayne Job Order Contract (JOC).No listed company matched (Materiality N/A)
- Sep 16, 2026CAVU CONSULTING LLC$4.3MZ1DA--Upgrade Elevators 506-24-102No listed company matched (Materiality N/A)
- Sep 10, 2026N-OVATION TECHNOLOGY GROUP LLC$684KProject No. 552-26-202 - Replace Overhead Paging SystemNo listed company matched (Materiality N/A)
- Sep 9, 2026VETERAN BUILDERS CORP$83KConstruct Concrete Pads for HVAC Maintenance 610A4-26-506No listed company matched (Materiality N/A)
- Sep 9, 2026KOALA ROOFING LLC$385K655-26-201 Repaint Water TowerNo listed company matched (Materiality N/A)
- Aug 20, 2026VALIANT CONSTRUCTION LLC$30.0MZ1DA--Project No. 610-25-500 - Marion Job Order Contract (JOC)No listed company matched (Materiality N/A)
- Aug 14, 2026VETERANS CONTRACTING, INC.$9.0MZ1DA--Improve Sub-Basement Plumbing and Air Quality - 541-24-103No listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.