Where this opportunity stands
Every notice posted under solicitation 127EAV26R0009 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The cont… (show all)
ractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.
Who won similar work
44 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Forest Service), same product/service code (PSC) Y1LB.
Single-winner award sizes (41): middle half $285K to $2.2M, median $605K; range $37K to $50.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| JUDD BUICK CONSTRUCTION, INC. | 2 | $4.1M | Aug 7, 2025 |
| MEDVED GLOBAL INC | 2 | $2.2M | Sep 25, 2026 |
| VARNER CONSTRUCTION LLC | 2 | $406K | May 14, 2026 |
| Multiple- See attached Ogden UT USA | 1 | $50.0M | May 8, 2025 |
| Multiple- See attached document Missoula MT USA | 1 | $50.0M | Oct 31, 2024 |
| Multiple- see attachment. Lakewood CO USA | 1 | $50.0M | Jun 26, 2025 |
| JPI CONSTRUCTION LLC | 1 | $11.9M | Sep 30, 2025 |
| GAVER INDUSTRIES, INC. | 1 | $8.2M | Jun 24, 2026 |
| TEMPO CONSTRUCTION LLC | 1 | $3.0M | Jun 1, 2026 |
| PIPKIN INC. | 1 | $2.8M | Jul 28, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 25, 2026MEDVED GLOBAL INC$1.5MTrickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
- Sep 14, 2026BRAYCO ENGINEERING, INC$1.8M127EAW26Q0041 - Cone Peak Road Repairs
- Sep 14, 2026KOVILIC CONSTRUCTION CO INC$1.2MGAOA Cooter Creek Rd Bridge Replacement (SC)
- Sep 11, 2026TWIN PINES CONSTRUCTION INC.$373KSuperior NF FR377 Tomahawk Road Repairs
- Sep 4, 2026GWO, Inc.$605KMPF Grant Creek Culvert Replacement
- Sep 2, 2026AM EXCAVATING LLC$1.8MIrving Peak White River Road Repairs
- Aug 5, 2026BOWEN, JACK Castleton VT 05735 USA$7.0M (shared ceiling)Green Mountain General Roads/Civil Construction IDIQ
- Aug 5, 2026HUNTER EXCAVATING, INC.$7.0M (shared ceiling)Green Mountain General Roads/Civil Construction IDIQ
- Aug 5, 2026MILL BROOK FARMS, LLC$7.0M (shared ceiling)Green Mountain General Roads/Civil Construction IDIQ
- Jul 31, 2026CALDERWOOD WOOD PRODUCTS & SERVICES LLC$388KSUF FR912 Little Isabella River Culvert Replacement
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied U.S. Forest Service since 2024 (0 filings)
- 0 of their lobbyists list a past U.S. Forest Service job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 15 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days