Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Army Corps of Engineers · W2SD ENDIST NEW ENGLAND
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912WJ26RA008 in this department, oldest first.
- Jul 13, 2026Pre-solicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The sco… (show all)
pe of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.
Who won similar work
6 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| JP SOLUTION LLC | 2 | $519K | Oct 30, 2025 |
| P & S CONSTRUCTION INC. | 1 | $3.8M | Sep 25, 2026 |
| MICK'S GENERAL CONTRACTING LLC | 1 | $250K | Oct 30, 2025 |
| VECTOR INDUSTRIES LLC | 1 | $250K | Oct 30, 2025 |
| QUODDY BUILDERS LLC | 1 | $163K | Feb 27, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 25, 2026P & S CONSTRUCTION INC.$3.8MConstruction Services for the Construction of the New Operations Office at East Brimfield Dam in Fiskdale, Massachusetts
- Oct 30, 2025VECTOR INDUSTRIES LLC$250KMinor Building Construction Blanket Purchase Agreement, Naugatuck River Basin, CT
- Oct 30, 2025JP SOLUTION LLC$250KMinor Building Construction Blanket Purchase Agreement, Naugatuck River Basin, CT
- Oct 30, 2025MICK'S GENERAL CONTRACTING LLC$250KMinor Building Construction Blanket Purchase Agreement, Naugatuck River Basin, CT
- May 30, 2025JP SOLUTION LLC$269KStorage Building Construction, Buffumville Lake, Charlton, MA
- Feb 27, 2025QUODDY BUILDERS LLC$163KUtility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA
Competitive landscape
For the 5 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.