Everglades National Park, Flamingo Marina Bulkhead Rehabilitation Monroe County, Florida
Army Corps of Engineers · W074 ENDIST JACKSNVLLE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912EP25RA006 in this department, oldest first.
- Aug 28, 2025 · this noticePre-solicitation
- Sep 3, 2025Pre-solicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Description of Work: The project work includes the removal of the existing concrete cap of the bulkhead walls, installation of new steel sheet pile bulkhead walls with cast-in-place concrete cap and precast concrete wall panel cap, site grading, and mechanical/plumbing/electrical equipment replacements and additions, and storm water outfall pipe extensions. The work also includes the removal and replacement of the asphalt/concrete pavement, timber guide and mooring piles, floating docks and aluminum ramps (where indicated on the plans), and modification of the fixed docks. The overall project … (show all)
site components encompass work to done within and around the four marina basins (Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay) located at the Flamingo Marina in the Everglades National Park. Shallow draft barges or similar is authorized, with approval by the Government, for use so long as dredging of the basins is not required, at no additional cost to the Government. Specific project components include the following items and incidental related work: The new sheet pile bulkhead wall systems are comprised of a total of approximately 3,900 linear feet. The installation of the sheet pile walls is offset 22 inches from the existing bulkhead walls for Whitewater Bay, Florida Bay, and Maintenance Marina Bay; and offset 22.5 inches from the existing bulkhead walls for Visitor Center Bay. The offset dimension is measured from the exterior face of the existing soldier piles to the centerline of the sheet piles. Flowable fill will be placed between the two wall systems. The precast concrete wall panel cap will overhang the sheet pile walls and tied into cast-in-place concrete cap, resulting in both wall systems being encompassed. The placement of the wall systems must not extend through the canal plug between Whitewater Bay and Florida Bay, and the structural canopy in Maintenance Marina Bay. The floating docks and aluminum ramps affected by the placement of the new wall systems (indicated on the plans) will be removed, stored, and reinstalled in approximately the same location. The affected docks will also include the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. Areas that involve work for the floating and fixed docks are located in Whitewater Bay and Florida Bay. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. The mechanical/plumbing/electrical equipment replacements and additions for Whitewater Bay, Florida Bay, and Maintenance Marina Bay will include the removal and replacement of utility pedestals, boat off-loading sewage pumps, fuel dispensers, electrical (circuit breaker) panels, plumbing and wiring/conduits for the equipment, sewage shore ties, and equipment housekeeping pads. The mechanical/plumbing/electrical equipment replacements and additions will also include the removal of the makeshift water stations on the east side of the Marina Store and the installation of a packaged utility wastewater pumping station (grinder pump) at the south wall of the Maintenance Marina Bay. Order of Work: The work for each of the bay/basin must be completed in the following order: (1) Whitewater Bay (STA 1+00 to STA 7+29.37) and Florida Bay (STA 7+67.42 to STA 11+37.78), (2) Whitewater Bay (STA 7+29.37 to STA 13+75.80), (3) Florida Bay (STA 1+00 to STA 7+67.42), (4) Visitor Center Bay, and (5) Maintenance Marina Bay. The first stage of work of the project must include all features of work indicated in the plans for Whitewater Bay from Station 1+00 to Station 7+29.37 and Florida Bay from Station 7+67.42 to Station 11+36.49. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, and flowable fill. The placement of the wall systems must not extend through the canal plug between Whitewater Bay and Florida Bay. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The second stage of work of the project (Option B) must include all features of work indicated in the plans for Whitewater Bay from Station 7+29.37 to Station 13+75.80. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The third stage of work f the project (Option C) must include all features of work indicated in the plans for Florida Bay from Station 1+00 to Station 7+67.42. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The fourth stage of work of the project (Option D) must include all features of work indicated in the plans for Visitor Center Bay from Station 1+00 to Station 6+86.31. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the concrete sidewalk near the Visitor Center building. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The fifth stage of work of the project (Option E) must include all features of work indicated in the plans for Maintenance Marina Bay from Station 1+00 to Station 10+63.10. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, and flowable fill. The placement of the wall systems must not extend through the structu
Who won similar work
36 award notices on SAM.gov in the last 24 months. Matched by: Same office (W074 ENDIST JACKSNVLLE), same NAICS 237990.
Single-winner award sizes (36): middle half $7.4M to $19.3M, median $9.4M; range $1.9M to $400.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| WEEKS MARINE, INC. | 4 | $74.8M | Apr 13, 2026 |
| GREAT LAKES DREDGE & DOCK CO, LLC | 4 | $62.5M | Feb 24, 2026 |
| THE DUTRA GROUP San Rafael CA 94901 USA | 3 | $45.4M | Sep 25, 2026 |
| CASHMAN DREDGING & MARINE CONTRACTING CO LLC | 3 | $44.6M | Aug 28, 2025 |
| CURTIN MARITIME CORP | 3 | $15.4M | Sep 24, 2026 |
| AHTNA MARINE & CONSTRUCTION COMPANY | 3 | $10.8M | Sep 17, 2026 |
| MARINEX CONSTRUCTION INC | 2 | $52.2M | Sep 11, 2026 |
| COTTRELL CONTRACTING CORPORATION | 2 | $18.8M | Jun 9, 2026 |
| SOUTHWIND CONSTRUCTION CORP | 2 | $10.3M | Sep 25, 2025 |
| ATLANTIC & GULF DREDGING & MARINE LLC | 2 | $8.7M | Jun 11, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 25, 2026THE DUTRA GROUP San Rafael CA 94901 USA$8.9MPort Everglades Harbor Maintenance Dredging Broward County, FloridaNo listed company matched (Materiality N/A)
- Sep 24, 2026CURTIN MARITIME CORP$4.0MPalm Beach Harbor Maintenance Dredging, Entrance Channel and Settling Basins, Palm Beach County, FloridaNo listed company matched (Materiality N/A)
- Sep 17, 2026AHTNA MARINE & CONSTRUCTION COMPANY$4.1MEVERGLADES HARBOR, MAINTENANCE DREDGING, COLLIER COUNTY, FLORIDA.No listed company matched (Materiality N/A)
- Sep 17, 2026Waterfront Property Services, LLC$8.0MBanana River, Maintenance Dredging, Brevard County, FloridaNo listed company matched (Materiality N/A)
- Sep 11, 2026MARINEX CONSTRUCTION INC$32.4MBEACH RENOURISHMENT, ANNA MARIA ISLAND, MANATEE COUNTY, FLNo listed company matched (Materiality N/A)
- Sep 10, 2026MANSON CONSTRUCTION CO 5209 E MARGINAL WAY S SEATTLE 98134 USA$22.8MNaval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia and Nassau County, FloridaNo listed company matched (Materiality N/A)
- Jul 20, 2026THE DUTRA GROUP San Rafael CA 94901 USA$21.6MTAMPA HARBOR MAINTENANCE DREDGING EGMONT AND MULLET KEY CUTS, HILLSBOROUGH COUNTY, FLNo listed company matched (Materiality N/A)
- Jun 11, 2026AHTNA MARINE & CONSTRUCTION COMPANY$3.1MMarine Corps Support Facility Blount Island Maintenance Dredging, Duval County, FloridaNo listed company matched (Materiality N/A)
- Jun 11, 2026ATLANTIC & GULF DREDGING & MARINE LLC$6.7MFort Myers Beach Harbor, Maintenance Dredging Lee County, FloridaNo listed company matched (Materiality N/A)
- Jun 9, 2026COTTRELL CONTRACTING CORPORATION$9.7MNaval Submarine Base Kings Bay, Maintenance Dredging, Camden County, GeorgiaNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.