26Z5AR6 - REPLACE INTERIOR FINISH
Bureau of Prisons · FCI BASTROP
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 15B50126PR000152 in this department, oldest first.
- Aug 14, 2026SolicitationOpen
- Aug 14, 2026SolicitationOpen
- Aug 18, 2026SolicitationOpen
- Aug 18, 2026SolicitationOpen
- Aug 19, 2026SolicitationOpen
- Aug 20, 2026SolicitationOpen
- Aug 21, 2026SolicitationOpen
- Aug 21, 2026SolicitationOpen
- Aug 25, 2026 · this noticeSolicitation
- Aug 28, 2026SolicitationOpen
- Sep 1, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Statement of Work Federal Bureau of Prisons Federal Correctional Institution (FCI) Bastrop, Texas Project # 26Z5AR6 Replace Interior Finish Completed quotes may be submitted electronically via e-mail to l4mitchell@bop.gov. All responsible sources must submit a typed quote on the attached specification sheet (RFQ, � SF 1449 15B50126Q00000014 Replace Interior Finish), which will be considered for award. Do not submit multiple quote request. 1. SPECIFICATIONS: A. INTRODUCTION The Federal Correctional Institution at Bastrop, located at 1341 Highway 95 North, Bastrop, TX 78602, has identified four … (show all)
(4) buildings with severe interior damage resulting from prolonged water intrusion caused by long-term roof leaks. The continued moisture exposure has resulted in deterioration of gypsum wall systems, ceiling assemblies, suspended ceiling systems, and wood paneling. These conditions may present unsanitary and potentially hazardous conditions, including the possible presence of microbial growth and other hazardous materials. Abatement is required to protect occupant health and prepare the spaces for future restoration. The Contractor is strongly encouraged to attend the pre-bid site visit identified in the solicitation, to assess existing conditions that may affect performance of contract work. *8/18/2026 - WAGE DETERMINATION FOR BASTROP COUNTY, TX HAS BEEN ADDED IN THE ATTACHMENTS SECTION. **There will be a site visit at FCI Bastrop, 1341 Highway 95 N, Bastrop, TX 77868 on Wednesday, August 26th at 1:00 PM CST. If you wish to attend, please email the points of contact in the solicitation and include background check paperwork for everyone wishing to enter available in the attachments section. Please do not digitally sign your name on the background check form, a physical wet signature is required. Background check paperwork is due on Thursday, August 20th at 1:00 PM CST. Please have a valid state or federal ID. B. SCOPE OF WORK Awarded Contractor shall furnish all labor, materials, equipment, supervision, and disposal necessary to abate, remove, and properly dispose of water-damaged interior finishes, including materials that may be impacted by hazardous or regulated substances, in accordance with this Statement of Work. C. CONTRACTOR�S REQUIREMENTS 1. The Contractor will be required to comply with all applicable federal, state, and local laws and regulations, including OSHA, EPA, and BOP safety, health, and security requirements. 2. The Contractor shall coordinate work activities with FCI Bastrop staff and or Contracting Officer�s Representative (COR). 3. The Contractor shall assume responsibility for identifying, controlling and properly handling hazardous materials encountered during the performance of this work, as specified herein. 4. Work shall be conducted in a manner that protects staff, inmates, visitors, and adjacent occupied spaces. C.1 Hazardous Material and Environmental Compliance C.1.1 General 1. Due to the age of the buildings and the duration of water intrusion, hazardous materials may be present, including but not limited to: - Mold or microbial contamination -Lead-based paint -Asbestos-Containing Materials (ACM) -Other regulated building materials. 2. The Contractor shall comply with all applicable requirements of OSHA, EPA and any other government regulatory agencies. C.1.2 Mold and Microbial Contamination 1. The contractor shall implement appropriate engineering controls, including containment and negative air pressure with HEPA filtration, when removing materials impacted by mold or suspected microbial growth. 2. Removal shall be performed to a point of clean, sound, and dry substrate. 3. Remaining surfaces shall be HEPA-vacuumed and cleaned in accordance with industry-recognized remediation practices. 4. The Contractor shall take reasonable measures to prevent cross-contamination during abatement. C.1.3 Lead-Based Paint 1. Due to the age of the buildings, painted surfaces disturbed during demolition may contain lead-based paint. 2. The Contractor shall perform work in accordance with applicable OSHA and EPA lead safety standards. 3. The Contractor shall implement appropriate worker protection and dust control measures. C.1.4 Asbestos-Containing Materials 1. The Government has conducted asbestos surveys of suspected building materials within the identified work areas. Testing was performed on materials reasonably suspected to contain asbestos, and the Government maintains documentation of all sampling results. 2. Based on testing performed to date, materials identified for removal under this Statement of Work are not known to contain asbestos. 3. If the Contractor encounters any material that differs from identified building material to be removed, the Contractor shall immediately stop work in the affected area and notify the COR prior to disturbing the material. 4. No material suspected of containing asbestos shall be disturbed, removed, or handled until the COR and FCI Bastrop Occupational Health & Safety Department staff have been consulted. 5. Failure to consult with the COR prior to disturbing questionable material may result in liability for unauthorized disturbance of regulated materials. C.2 CONTAINMENT AND PROTECTION 1. The Contractor shall provide dust, debris, and hazard containment using polyethylene barriers, negative air machines, and HEPA filtration as required. 2. Adjacent occupied spaces, mechanical systems, and finishes shall be protected from contamination. 3. The contractor shall always maintain safe and secure egress routes. C.3 ABATEMENT AND DEMOLIITION REQUIREMENTS 1. Gypsum Wallboard a. Remove and dispose of approximately 23,500 square feet of �-inch wallboard damaged by water intrusion and potential microbial contamination. 2. Gypsum Ceilings a. Remove and dispose of approximately 5,500 square feet of gypsum ceiling systems, including associated framing and insulation where damaged. 3. Suspended Ceilings a. Remove and dispose of approximately 1,100 square feet of suspended ceiling systems, including tiles, grid, hangers, and supports impacted by moisture. 4. Wood Paneling a. Remove and dispose of approximately 1,200 square feet of water-damaged wood paneling, including furring strips and fasteners. C.3.1 REFERENCE DRAWINGS Attached reference drawings are provided for work requirements and the Contractor�s benefit. The Contractor is encouraged to visit the project work site prior to submitting a bid to confirm existing conditions and measurements of the demolition areas. ATTACHMENT A - LOCATION PLAN ATTACHMENT B � CHAPEL BUILDING 400 ATTACHMENT C � PYSCHOLOGY BUILDING 500 ATTACHMENT D � EDUCATION BUILDING 600 ATTACHMENT E � LAUNDRY BUILDING 900 C.4 WASTE HANDLING AND DISPOSAL 1. All waste materials, including potentially contaminated debris, shall be bagged, sealed, labeled, and transported in accordance with applicable regulations. 2. Disposal shall be performed at approved facilities. 3. Waste disposal manifest shall be provided to the COR upon request. C.2 FINAL CLEANING 1. Perform final HEPA cleaning of all work areas. 2. Remove containment systems only after COR approval. 3. Leave all spaces clean and ready for restoration work. D. UTILITIES The FBOP will provide water and minimal electricity service (120V) but may not be in close proximity to the work site for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project. E. ACCEPTANCE AND CLOSEOUT The Contractor shall notify the Contracting Officers Representative (COR) two (2) working days prior to the final testing and/or certification so that arrangements can be made to have BOP required staff available to observe inspection. A complete plan detailing any required testing procedures must be submitted in advance for final check out and testing of work. F. WARRANTY The Contractor warrants that work performed under this contact conforms to workmanship performed by th
Who won similar work
8 award notices on SAM.gov in the last 24 months. Match: Same agency (Bureau of Prisons), same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Sealaska Secure Construction Solutions, LLC | 1 | $14.0M | Sep 4, 2026 |
| Goldbelt Government Services, LLC | 1 | $12.5M | Jul 27, 2026 |
| BERING STRAITS PROFESSIONAL SERVICES, LLC | 1 | $7.1M | Sep 14, 2026 |
| GOLDBELT OPERATIONS SUPPORT SERVICES LLC | 1 | $3.2M | Jul 3, 2025 |
| JAXON CONSTRUCTION INC | 1 | $754K | Sep 19, 2025 |
| ACCEL CONSTRUCTION SERVICES GROUP, LLC | 1 | $719K | Sep 18, 2025 |
| P5 TEAM LLC | 1 | $61K | Sep 17, 2026 |
| ELBOW GREASE ENTERPRISES, LLC | 1 | $18K | Feb 21, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 17, 2026P5 TEAM LLC$61K26Z5AR6 - REPLACE INTERIOR FINISH
- Sep 14, 2026BERING STRAITS PROFESSIONAL SERVICES, LLC$7.1MFCC FLORENCE - 26Z4AH4 REPLACE MDP
- Sep 4, 2026Sealaska Secure Construction Solutions, LLC$14.0MFiber and Cabling Installation Services
- Jul 27, 2026Goldbelt Government Services, LLC$12.5MRepair Building Exterior at MDC Brooklyn
- Sep 19, 2025JAXON CONSTRUCTION INC$754KEmergency Repair Storm Damage- FCI Big Spring
- Sep 18, 2025ACCEL CONSTRUCTION SERVICES GROUP, LLC$719KMCC Chicago - Replace SHU Doors
- Jul 3, 2025GOLDBELT OPERATIONS SUPPORT SERVICES LLC$3.2MRepair Unicor Roof - Hurricane- FCI Atlanta
- Feb 21, 2025ELBOW GREASE ENTERPRISES, LLC$18KFCI Three Rivers Remodel Firing Range Dirt Work
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Bureau of Prisons (BOP) since 2024 (0 filings)
- 0 of their lobbyists list a past Bureau of Prisons (BOP) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 1 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.