Special NoticePosted Jul 3, 2025·Responses due Jul 14, 2025

6515--Notice of intent to Sole source

Veterans Affairs · 256-NETWORK CONTRACT OFFICE 16 (36C256)

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
339113
Value
Not stated
Solicitation
36C25625Q1113
Set-aside
None stated
PSC
6515
Place
Not stated
Contact
Tina Harris (tina.harris3@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C25625Q1113 in this department, oldest first.

Early notice
  • Jul 3, 2025 · this notice
    Special Notice
Solicitation
None posted
Award
  • Jul 29, 2025
    Award Notice
    HOWMEDICA OSTEONICS CORP · $3.6M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

STATEMENT OF WORK (SOW) MAKO4 ROBOT Michael E. DeBakey VA Medical Center Program Objective The Michael E. DeBakey VA Medical Center (MEDVAMC) is requesting Stryker Mako 4 System will be utilized. to assist surgeons in performing total joint replacement and spine procedures and to help increase the volume of joint replacement and spine surgeries. The Mako4 system is the only robotic orthopedic technology available that can assist with knee, hip, spine, and shoulder procedures, making it essential for broadening the scope of care provided. By acquiring this equipment, we will be able to offer mo… (show all)

re comprehensive services to a larger patient population, further enhancing the range of care available within the VA. The robotic platform will enable the surgeons to virtually plan surgical procedures, make dynamic inter-operative changes to the plan, and utilize the robotic arm with haptic boundaries to execute the plan. The implementation of the technology into the service line will be completed with minimal initial time delays and no compromises to patient outcomes both of which are supported by the literature. The Mako4 Surgical System will improve Veteran s access to minimally invasive surgery by making robotic surgery available to more Veterans and expanding the diseases that can be treated minimally invasively. Scope: The contractor shall provide, transport, install, and test all equipment. All equipment and installation must meet manufacturers and VA specifications. The contractor is responsible for any missing parts and components not included in the order to carry out the installation. The contractor shall furnish all supplies, equipment, facilities, and services required for delivery and installation of supplies and equipment. All products must meet all salient characteristics defined in this section: Product must meet all VA security and networking requirements prior to coming onsite. Hardware/software must meet or equivalent to the specs indicated below and must be compatible with MEDVAMC equipment. (Insert line items on Mako4 quote / price) DELIVERY, INSTALLATION, AND IMPLEMENTATION DELIVERY Contractor shall deliver all equipment to the Michael E. DeBakey VA Medical Center, 2002 Holcombe Blvd. Houston, TX 77030. Minimal storage time available in warehouse. Deliver materials to job in manufacturer's original sealed containers with brand name marked thereon. Package to prevent damage or deterioration during shipment, handling, storage, and installation. Maintain protective covering in place and in good repair until removal is necessary. Deliver specified items only when the site is ready for installation work to proceed. Install all equipment to manufacturer s specifications maintaining Federal and local safety standards. Store products in dry condition inside enclosed facilities. Any government requested delayed delivery up to 120 days after initial award delivery date, shall be at no additional cost to the Government. A pre-delivery meeting will be conducted 30 days prior to initial delivery for verification of delivery and installation dates. Delivery and Installation will be coordinated through the COR. INSTALLATION AND IMPLEMENTATION The contractor shall provide installation. The contactor must conduct pre-installation meetings to gather required information for installation. The contractor shall be responsible for all equipment until installed and accepted by the Government. All required equipment shall be fully installed by the Contractor The Contractor shall remove all related shipping debris and cleanup, any construction associated with delivery and installation of the specified items. Contractor shall remove all packaging from the MEDVAMC premises. The Contractor shall be responsible for any damage to the building that occurs due to Contractor error or neglect. Installation must be completed between 7:30 AM to 4:00 PM, Monday through Friday excluding federal holidays. Federal holidays available at the Federal Holiday OPM site. If there is an operational conflict with installation, government will provide 48 hour notice of installation change hours. The contractor shall coordinate all deliveries, staging areas, installations, and parking arrangements with the COR. Upon coordination with COR for installation, the contractor shall inform the Contracting Officer of any problems which may be anticipated about installation, or which will affect optimum performance once installation is completed. Warranty And Support Warranty and support for the equipment will be provided for 5 years upon receipt and acceptance of the equipment. The warranty and support must be provided to cover all components. 4 hours on-site premium support. All hard drives will be VA property and be kept for sanitization SITE CONDITIONS There shall be no smoking, eating, or drinking inside the hospital at any time unless done so in designated dining areas. Period of Performance: The maximum Period of Performance for overall project is 1 year after contract award. The anticipated period of performance for support services from the warranty is at a minimum 1 year from acceptance. Support services begin when physical installation and final implementation of all buildings are complete. Option Year dates will start from warranty end date. INSPECTION AND ACCEPTANCE The Contractor shall conduct a joint inspection with the COR once all equipment had been delivered and installed. The COR shall inspect all phases of delivery and installation and provide a punch list of any and all missing or damaged products. Contractor shall provide dates of completion of punch list items and replacement parts and/or short ship items from the manufacturer(s). The COR shall ensure all work is completed satisfactorily prior to acceptance. Disputes shall be resolved by the Contracting Officer. DELIVERABLES User and Service Manuals The Contractor shall provide, at no charge, two (2) complete and unabridged printed copies and one (1) electronic version (CD) of operator manuals, service manuals, electronic schematics, troubleshooting guides and parts lists for each model of equipment purchased to the Contracting Officer s Representative (COR) with delivery of equipment. Additionally, the Contractor free of charge shall provide any upgrades to these documents. These manuals will include all components and subassemblies, including those not manufactured by the Contractor. These manuals and documentation shall contain the diagnostic codes, commands, and passwords utilized in maintenance, repair and calibration of the equipment. Deliver all compilation of manufacturer recommended maintenance schedule and operation materials to COR upon completion of installation PROTECTION OF PROPERTY Contractor shall protect all items from damage. The Contractor shall take precaution against damage to the building(s), grounds and furnishings. The Contractor shall repair or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor. The Contractor shall perform an inspection of the building(s) and grounds with the COR prior to commencing work. To ensure that the Contractor shall be able to repair or replace any items, components, building(s) or grounds damaged due to negligence and/or actions taken by the Contractor. The source of all repairs beyond simple surface cleaning is the facility construction contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence from the VA Facilities Management POC and COR is required before the Contractor may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade, and color to match adjacent existing work. The Contractor shall be responsible for security of the areas in which the work is being performed prior to completion. Contractor shall provide floor protection while working in all VA facilities if needed. All material handl

Who won similar work

5 award notices on SAM.gov in the last 24 months. Matched by: Same office (256-NETWORK CONTRACT OFFICE 16 (36C256)), same product/service code (PSC) 6515 and NAICS 339113.

Single-winner award sizes (5): middle half $27K to $167K, median $81K; range $12K to $186K.

WinnerAwardsValueLast
AB MARTIN SERVICES INC1$186KAug 21, 2026
WYEAST MEDICAL CORP1$167KJun 26, 2026
CW FINANCIAL & MANAGEMENT GROUP LLC1$81KSep 17, 2026
DGA MEDICAL LLC1$27KApr 15, 2026
WONDER STATE SOLUTIONS LLC1$12KMay 29, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 5 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.