Sources SoughtPosted Sep 21, 2026·Responses due Oct 17, 2026

CFA-686 Carbon-based Fuels Capability CO2 Compressor Design/Build

Energy · BATTELLE ENERGY ALLIANCE�DOE CNTR

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
Not stated
Value
Not stated
Solicitation
INL-26-055
Set-aside
None stated
PSC
Not stated
Place
Idaho Falls, ID, USA
Contact
Chase Egbert (chase.egbert@inl.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation INL-26-055 in this department, oldest first.

Early notice
  • Sep 21, 2026 · this notice
    Sources Sought
  • Sep 21, 2026
    Sources Sought
    Open
Solicitation
None posted
Award
Not yet. Typical award: Oct 12, 2026 to Dec 12, 2026, middle of the range Oct 22, 2026.
Measured from 192 past early notices at Energy, Department of that later posted an award (middle half of cases, counted from Sep 21, 2026).
Responses are due Oct 17, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from prospective offerors to support the design, fabrication, testing, and delivery of a CO2 compressor for the Central Facilities Area (CFA) Carbon-based Fuels Capability. PROCESS BEA is seeking qualified firms to compete for the design/build contract in support of the CFA-686 CO2 Compressor. As determined by BEA, responders to this EOI may receive a Request for Proposal (RFP) that will requ… (show all)

ire detailed technical and price proposals be provided for evaluation and ranking under a source selection process. Interested firms are advised that RFP release and the source selection/award decision timeline will be communicated following review of submitted EOIs. The contract award type will be firm-fixed price. Per the proposed project schedule, all durations are After Receipt of Order (ARO): Engineering Documentation Report (3 weeks), shop fabrication drawings (4 weeks), complete shop fabrication (40 weeks), and compressor arrival at INL (3 weeks). PROJECT DESCRIPTION The compressor will be designed, fabricated, tested, and delivered for the INL Central Facilities Area (CFA) Carbon-based Fuels Capability (CFA-686). The compressor will be used to compress CO2 from a combustor unit into a storage vessel that will supply gas to downstream users, and will be housed in a protected shipping container. The compressor shall be oil-free, liquid-cooled, fixed speed, and electric motor driven. Inlet conditions are 50-100�F at 0.14-2 psig; outlet conditions are 1,400 psig, 66.1 scfm, and 150�F, with the unit operating on a nearly continuous basis. The compressor and all components must fit within a high cube shipping container with interior dimensions of 19'6" long x 7'9" wide x 8'10" high, and must be mounted on a structural frame designed and fabricated in accordance with the American Institute of Steel Construction (AISC), with welding per AWS D1.1. Any pressure vessels used in fabrication of the compressor must be designed and fabricated in accordance with ASME Section VIII, Division 1, and stamped and registered with the National Board. The compressor must withstand a CO2 gas stream composition of approximately 99% CO2 with trace nitrogen, oxygen, water vapor, carbon monoxide, nitrogen oxides, sulfur oxides, hydrocarbons, hydrogen sulfide, and hydrogen chloride. The unit will be installed at INL at an altitude of approximately 4,938 ft, with a shipping container temperature range of 41�F to 104�F and humidity from 0 to 100%. The compressor package must include a control panel with instrumentation and alarms for conditions such as low discharge pressure and motor failure, a data history logging function, an emergency shutoff switch, and UL-508A listed control panels. The unit must be provided with inter-coolers or after-coolers to maintain outlet temperature at or below 150�F, and a stainless steel drip pan sized to contain at least 1.5 times the volume of any fluids contained in the compressor. Specific fabrication drawings, nozzle location diagrams, and design details will be provided to qualified offerors as part of the RFP process. PROCESS This EOI is the first step in identifying interested and qualified vendors for future solicitation. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested firms are requested to provide expressions of interest to Chase Egbert (chase.egbert@inl.gov) by close-of-business on 10/16/2026. Included must be sufficient written information confirming the responder's qualifications addressing each of the following criteria: Experience in design and fabrication of oil-free, liquid-cooled CO2 or industrial gas compressor packages. Experience with ASME Section VIII, Division 1 pressure vessel design where applicable to compressor components, and structural fabrication in accordance with AISC and AWS D1.1. Capability to meet the design/build schedule outlined above. Capability to package the compressor, motor, controls, and all interconnecting piping and instrumentation within the required shipping container footprint. Proper identification and execution plan for inspection, examination, and testing, including non-destructive examination of castings and welds, operational testing, and a 10-hour continuous reliability test. Agreement to maintain a written Quality Assurance Plan based on a national consensus code such as ANSI/ASME ISO-9000. Capability to provide Operations & Maintenance documentation, a Recommended Spare Parts List, and field support for startup and commissioning. Note that responses must be no more than 5 pages in length. Only potentially qualified offerors, as determined by BEA, will receive the RFP for the project. Interested individuals are advised that the selection decision is anticipated in November 2026. If you have questions, need additional information, or need to speak with a BEA Point of Contact, please contact the following via email: Project Manager - Ben Bryson - Benjamin.Bryson@inl.gov Project Engineer - Chris Dudley - Christopher.Dudley@inl.gov Technical questions must be submitted in writing via email.

Who won similar work

834 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Energy), any industry: a loose match.

Loose match: same agency, any industry. Read the titles before treating these as competitors.

Single-winner award sizes (819): middle half $28K to $497K, median $85K; range $267 to $3.0B.

WinnerAwardsValueLast
DH TECHNOLOGIES, INC.16$2.8MSep 29, 2026
VALI COOPER INTERNATIONAL LLC14$37.2MAug 5, 2026
ENERGY BY NATIVE AMERICAN DESIGN CORP11$2.8MJun 2, 2026
RLH INC.11$514KSep 2, 2026
COUNTERTRADE PRODUCTS, INC.11$300KSep 24, 2026
THUNDERCAT TECHNOLOGY, LLC9$3.4MAug 13, 2026
VECTOR RESOURCE INC8$85.9MAug 3, 2026
HUGHES BROTHERS INC8$10.3MAug 20, 2026
Aantilia LLC8$504KSep 24, 2026
SOFTWARE INFORMATION RESOURCE CORP.8$82KJul 27, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Energy, Dept of since 2024 (0 filings)
  • 0 of their lobbyists list a past Energy, Dept of job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 75 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.