Federal Procurement Notice•Posted: 2024-11-04

Sources Sought - Renovate Sijan Hall Dormitory - Phase 1, USAFA CO

Entity
DEPT OF DEFENSE
Posted
2024-11-04
DepartmentDEPT OF DEFENSE
Notice Typer
NAICS236220
Notice IDb101cfac1fda44a491c614efb32bf3df

Source Record

SOURCES SOUGHT RENOVATE SIJAN HALL, PHASE 1 W9128F25SC004 PURPOSE: By way of this Sources Sought Notice, the USACE-Omaha District intends to determine the extent of capable small business or other than small business firms that are engaged in providing the requirement described hereunder. The responses to this notice will be used for planning purposes for developing the general conditions and acquisition method for an upcoming contract requirement to renovate Sijan Hall (Building 2348), a cadet dormitory building at the United States Air Force Academy (USAFA) located in Colorado Springs, Colorado. Therefore, this notice does not constitute a Request for Proposal (RFP), Quotation or Bid; it does not guarantee the future issue of an RFQ/RFP/IFB; nor does it commit the Government to contract for any supply, service, or construction. There is no solicitation currently available. THIS IS NOT A PRESOLICITATION OR SOLICITATION ANNOUNCEMENT. After review of the responses to this notice, and if the Government intends to proceed with the acquisition, a separate pre-solicitation announcement will be published on the System for Award Management (SAM) website (sam.gov). Responses to this SOURCES SOUGHT NOTICE are not adequate responses to any future solicitation announcement. All interested parties and potential offerors are responsible for monitoring SAM for any future postings. The purpose of this notice is to gain knowledge of, and determine the availability of, potentially qualified small and large business sources and their size classifications relative to the North American Industry Classification System (NAICS) Code of 236220, �Commercial and Institutional Building Construction,� to assist the Government in determining the most appropriate acquisition method for this contract requirement, including whether a small business set-aside is possible and/or appropriate. In addition, the purpose of this notice is to request information from interested Contractors to assist the Government in planning for and developing the general conditions for this pending contract requirement. Specific response requirements and questions are outlined below within this notice. Please note that this research is for planning and information purposes only and does not constitute a solicitation for competitive bids/proposals and is not to be construed as a commitment by the U.S. Army Corps of Engineers. However, all interested parties are invited to respond, via email, to this Sources Sought Notice. ANTICIPATED CONTRACT DESCRIPTION AND SCOPE � RENOVATE SIJAN HALL, PHASE 1: The project will be located at the United States Air Force Academy in Colorado Springs Colorado. The project will include various types of horizontal and vertical scope, including architectural, interior design, mechanical, electrical, exterior envelope, structure, fire protection, and site improvements. Sijan Hall (Building 2348) is the second of the two cadet dormitory buildings at the United States Air Force Academy, located in Colorado Springs, Colorado, and construction was completed in 1968. The primary function of Sijan Hall is a dormitory for Cadets and was designed to house 2,520 students in 1968; currently there are 1,926 Cadets that occupy Sijan. Several other ancillary functions are also housed in Sijan Hall. This six-story building is located on the south side of the Cadet Area. The facility with approximately 625,300 square feet is listed as a part of the Air Force Academy�s National Historic District. The renovation of Sijan Hall will be broken up into five (5) stand-alone phases, with each phase to be constructed independently, to accommodate the relocation of displaced cadets and thus allow the remainder of the building to be open and operational as each phase is being renovated. No disruptions to functions will be permitted to the phases and portions of the building that are not being renovated. The focus of this Sources Sought / Request for Information is limited to Phase 1 which includes the renovation of approximately 135,000 SF of the building representing Phase 1. Phase 1 will be solicited as a 100% design and will include, but not be limited to: interior renovations, exterior curtain wall replacement, mechanical, electrical, plumbing, fire protection, life safety, energy management, any associated exterior and utility work, and communication systems. Other portions of the building will be occupied during performance of work under Phase 1. It is anticipated that the solicitation for the Phase 1 renovation will be issued in June 2023 for a FY 2023 award. Sijan Hall currently does not meet the latest USAFA Design Standards, so the design to be constructed under Phase 1 will ensure that items replaced or upgraded comply with the current USAFA Design Standards. Most of the existing building systems have exceeded their useful life and will be removed and replaced as part of this project. Repairs to the facility are required to address repetitive system maintenance, prevent further deterioration of the building�s systems, components, and infrastructure, and facilitate future maintenance of all new building systems and infrastructure. The building�s exterior envelope and systems will need to be modernized to meet the requirements of Unified Facilities Criteria (UFC) 1-200-02, High Performance and Sustainable Building Requirements. Phase 1 renovation will address interior renovations, new architectural finishes and interior upgrades, interior work brought down to the structure and rebuilt per USAFA standards, the removal and abatement of asbestos containing materials and lead based paint. Phase 1 will also include removal and replacement of all exterior curtain wall systems within the boundary of Phase 1, and will provide all mechanical, electrical, plumbing, and fire protection work back to the mechanical room(s) that serve the areas within Phase 1. Phase 1 will also involve installing building systems to include mechanical, plumbing, low voltage, electrical and communication systems; for example, isolation valves and bypass capability on the High Temperature Hot Water (HTHW) system so each mechanical and plumbing zone will be independently isolated. In addition, Phase 1 will include the replacement of three (3) substations. A ground source heat pump system will be used for all phases of the Sijan Hall renovation, with Phase 1 providing the entire well field, including 160 6� wells drilled to approx. 400+�. This well field will be located south of Sijan Hall and placed in the sloped hillside north of the cadet parking lot. The roof of Sijan Hall has been completely replaced and therefore is excluded from the scope of work; however, isolated repairs may be required for roof penetrations associated with Phase 1 work. The overall intent of this project is to bring the facility up to code. Where non-code compliant building construction, components, and features are identified by the life safety and building code analysis, they will be corrected as part of the project construction. As part of the life safety and building code analysis, the construction type of the facility shall be identified. The current construction type will comply with the International Building Code (IBC) 2018 and applicable UFC, NFPA and ADA. Sijan Hall will be used primarily as a dormitory and will be classified as a residential Group R-2. The building will also consist of small accessory assembly and office spaces (i.e., individual offices and barber shop). These assembly and office spaces will be individually classified per sections 302.1 and 508.2 of the IBC. All current codes, UFC�s and USAFA Standards will be incorporated into the final product. The existing facility does not comply with UFC 3-600-01, Fire Protection Engineering for Facilities, but shall be brought to compliance with this UFC as part of this project. This UFC requires complete sprinkler protection regardless of floor area or construction type. Also, tempor

Sources Sought - Renovate Sijan Hall Dormitory - Phase 1, USAFA CO | HillSignal — HillSignal