SolicitationPosted Jun 10, 2025·Original deadline passed (Jul 9). See latest amendment for current deadline.

Z1DA--NRM-CONST NO CONTRACT YET PROJ#528A5-21-504-Upgradde Fire Alarm System

Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)

Stage
Open solicitation
NAICS
236220
Value
Not stated
Solicitation
36C24225B0037
Set-aside
None stated
PSC
Z1DA
Place
Not stated
Contact
Nicholas Winne (nicholas.winne@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24225B0037 in this department, oldest first.

Early notice
  • May 29, 2025
    Pre-solicitation
    Open
Solicitation
  • Jun 10, 2025 · this notice
    Solicitation
  • Jun 10, 2025
    Solicitation
    Open
  • Jun 20, 2025
    Solicitation
    Open
  • Jun 26, 2025
    Solicitation
    Open
  • Jul 8, 2025
    Solicitation
    Open
  • Jul 8, 2025
    Solicitation
    Open
  • Jul 9, 2025
    Solicitation
    Open
  • Jul 15, 2025
    Solicitation
    Open
  • Jul 16, 2025
    Solicitation
    Open
Award
  • Aug 5, 2025
    Award Notice
    TACTICAL CONSTRUCTION, INC · $2.5M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

1.2 STATEMENT OF WORK (SOW) SCOPE OF WORK Project No. 528A5-21-504 Upgrade Fire Alarm System Finger Lakes Health Care System Canandaigua VA Medical Center 400 Fort Hill Avenue Canandaigua, NY 144 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Canandaigua VAMC is located at 400 Fort Hill Avenue, Canandaigua, NY 14424. The layout is a campus with more than 30 buildings located on over 150 acres. Normal working hours are Monday Friday 8:00am 4:30pm. The existing fire alarm system only alerts via an audible alarm when the AED s and FACP s are opened, and the existing fiber optic c… (show all)

onnections are not reliable. The general intent of this project is to install door contacts to be monitored by the security system, and upgrades to the fiber optic connections as described below and in the project documents. Scope of Work: Provide all labor, material, equipment, supervision to perform the flowing: Upgrade the fire alarm system for 11 buildings (4,5,6,7,8,10,11 16,36,37,118) to establish the addressable fire alarm system and meet latest code. Upgrade the existing fire alarm control panels by replacing the existing modems in each FACP with new network cards and audio controllers to establish the ES network. Fire alarm devices: Upgrade the existing fire alarm devices as necessary (replace speaker strobes and strobes in all above buildings) to comply with the new system, by reusing and/or replacing the existing conduit, cabling, and backboxes per the project documents attached. Field survey required to ensure exact amount. Fiber optic: The existing 62.5-micron multimode fiber will support the new system. Replace all existing connectors (ST-type) with the (SC-type) connector specifies with the new system. Reuse the existing fiber. Retested the fiber after replacing the connectors to assess its condition and determine a usable fiber pair to support the system. AEDs: Connect the AEDs to the fire alarm system in all buildings. Provide and install new door contacts to the AED enclosures. Provide and install new conduit and cable to connect the AEDs to the FACP in each building. Connect the FACP in each building into the security panel. Abatement: Provide all labor, material, equipment, supervision to remove the asbestos containing pipe insulation in the basement of Building 4 as shown in the project documents. Provide and install new pipe insulation. Building 16: Install new NDU/NVCC panel to keep the audio loop operational during construction. Connect the master fire alarm control panel (MFACP) to the fire department radio system to notify fire department personnel the location of any event. Install new NDU/NVCC panel to keep the audio loop operational during construction. Building 10 and 11: Install IDNAC repeater to ensure adequate power to all devises. These buildings do not have their own FACP and are connected to the FACP in building 16 by copper cabling, existing cabling is to be used. Refer to the design drawing, specification and fiber optic test result attached. Refer to 01 00 00 General Requirements for a more detailed statement of bid. General Requirements: The contractor shall review the contract documents in their entirety prior to submitting their bid. a. Pay particular attention to, but not limited to, the following Division 1 specification sections. i. 01 00 00 General Requirements 1. Statement of Bid ii. 01 32 00 Construction documentation iii. 01 32 16.15 Project Schedules iv. 01 35 26 Safety Requirements v. 01 45 00 Quality Control vi. 01 74 19 Construction Waste Management. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Canandaigua VA shall not accept deliveries for project purposes. Any non-lead time materials will only be paid for when installed. Any items identified as punch list items will be fixed prior to project closeout. Off tour work may be required to minimize impact to Veterans and employees. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the new area. Submittals: The following submittals, at minimum, are to be submitted within 30 days of the notice of award. Draft of project schedule and schedule of values (SOV). Safety Plan Quality Control Plan Waste Management Plan ACM Abatement Plan The kick-off meeting will be scheduled immediately after the official Notice of Award. A pre-construction meeting is planned to take place approximately 40 days following the issuance of the Notice of Award. Notice to proceed will be issued same day starting the period of performance. The contractor shall maintain an accurate excel spreadsheet listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. Autodesk Construction Cloud Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform. Contractor shall accomplish and complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days. Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 business days. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, r

Who won similar work

12 award notices on SAM.gov in the last 24 months. Matched by: Same office (242-NETWORK CONTRACT OFFICE 02 (36C242)), same product/service code (PSC) Z1DA and NAICS 236220.

Single-winner award sizes (12): middle half $822K to $13.7M, median $2.6M; range $99K to $45.6M.

WinnerAwardsValueLast
SERVIAM CONSTRUCTION LLC2$17.4MJul 11, 2025
IRON SWORD ENTERPRISES, LLC2$1.7MMar 30, 2026
Amerifield JV LLC1$45.6MAug 28, 2025
CDEEM CO ORLANDO 32825 FLK1$22.9MMay 1, 2025
WAINSCHAF ASSOCIATES, INC.1$13.3MJun 30, 2026
F & C GROUP JV LLC1$3.9MApr 8, 2026
PATRIOT SONS USA LLC1$2.5MJul 29, 2025
VETERANS HOPE ASSOCIATES INC1$890KSep 23, 2026
J & J MECHANICAL AND CONSTRUCTION GROUP LLC1$559KMar 25, 2025
NORTHERN DREAMS CONSTRUCTION, INC1$99KSep 9, 2025

Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.