MV-22 Block B to Block C Mission Computer Obsolescence Initiative Delta Non-Recurring Engineering Integration
NAVAIR and air warfare centers · NAVAL AIR SYSTEMS COMMAND
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N00019-26-RFPREQ-APM275-0801 in this department, oldest first.
- Sep 24, 2026 · this noticePre-solicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Naval Air Systems Command, V-22 Joint Program Office (PMA-275), intends to negotiate and award a sole-source Delivery Order to the Bell Boeing Joint Project Office for the procurement of Non-Recurring Engineering required to integrate the Osprey Drive System Safety Health Information, Traffic Collision Avoidance System, and Manual Override Switch capabilities into the MV-22 Block B to Block C Mission Computer Obsolescence Initiative retrofitted aircraft. The estimated period of performance is two years, with anticipated award in September 2027. This action is being awarded on a sole-source bas… (show all)
is to the Bell Boeing Joint Project Office in accordance with the statutory authority permitting other than full and open competition under Title 10 U.S.C. 3204(a)(1), as implemented by FAR 6.103-1, �Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.� Bell Boeing is the sole designer, developer, and producer of the V-22 Tiltrotor aircraft and is the only known source that possesses the requisite knowledge and expertise required to perform this effort. Bell Boeing is also the only source that possesses the totality of engineering and technical data required to perform these efforts. Interested persons may identify their interest and capability to respond to the requirement. This notice of intent is not a request for competitive proposals. However, any capability statements received within 15 days after the date of publication of this synopsis will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. For possible subcontracting opportunities, please contact the Bell Boeing Joint Project Office. Bell: supplierdiversity@bh.com Boeing: jennifer.m.mckeon@boeing.com
Who won similar work
91 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 336413.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BELL BOEING JOINT PROJECT OFFICE Amarillo TX 79111 USA | 20 | $557.8M | Sep 28, 2026 |
| SIKORSKY AIRCRAFT CORPORATION · $LMT | 10 | $111.5M | Jun 29, 2026 |
| THE BOEING COMPANY · $BA | 7 | $1.3B | Oct 14, 2026 |
| General Atomics San Diego CA 92121 USA | 7 | $264.8M | Aug 27, 2026 |
| RAYTHEON COMPANY · $RTX | 6 | $177.3M | Sep 22, 2026 |
| LOCKHEED MARTIN CORP · $LMT | 5 | $523.8M | Oct 9, 2026 |
| ROCKWELL COLLINS, INC. · $RTX | 4 | $142.9M | Sep 29, 2025 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION · $NOC | 4 | $111.2M | Jul 14, 2026 |
| GENERAL ATOMICS AERONAUTICAL SYSTEMS, INC. | 4 | $19.8M | May 6, 2025 |
| HONEYWELL INTERNATIONAL INC. | 3 | $11.3M | Sep 22, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 14, 2026THE BOEING COMPANY$16.7MF/A-18E/F and EA-18G Production Line Shutdown
- Oct 9, 2026LOCKHEED MARTIN CORP$57.7MMulti Domain Combat System (MDCX) Follow On Contract
- Sep 30, 2026KATO ENGINEERING INC.$49.3MElectromagnetic Aircraft Launching System (EMALS) Energy Storage Subsystem (ESS) Sustainment IDIQ
- Sep 28, 2026BELL BOEING JOINT PROJECT OFFICE Amarillo TX 79111 USA$63.9MConversion Area Harness Kits
- Sep 22, 2026HONEYWELL INTERNATIONAL INC.$2.7MV-22 Shaft Driven Compressor (SDC) Test Bench Procurement and Integration
- Sep 22, 2026BELL BOEING JOINT PROJECT OFFICE Amarillo TX 79111 USA$20.0MV-22 Software Sustainment Release Candidate 02
- Sep 22, 2026BELL BOEING JOINT PROJECT OFFICE Amarillo TX 79111 USA$2.1MGen. 6 Radio Upgrades
- Sep 22, 2026BELL BOEING JOINT PROJECT OFFICE Amarillo TX 79111 USA$29.7MV-22 Loads and Dynamics Models
- Sep 22, 2026RAYTHEON COMPANY$35.1MV-22 SOFTWARE SUSTAINMENT RELEASE CANDIDATE 02
- Aug 28, 2026THE BOEING COMPANY$156.2MNotice of Award for P-8A Engine Build-Up (EBU) and C-40A Quick Engine Change (QEC) kits and mating to CFM56-7B Core Engines
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 4 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (48 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- $1.5M from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 4 of the past winners are listed companies
- 0 insider buys and 6 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.