Loading the records…
Loading the records…
Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)
Veterans Affairs is planning to buy "630A4-26-102 GI RENOVATION PHASE III". This is an early notice: it is not taking bids yet. The work is in Brooklyn, NY, USA. The original due date (Dec 30, 2025) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 10 or more companies, usually for about $2.6M per award. An award could come any day: the usual time to award has passed.
Put together from the facts on this page; the details and sources are below.
Your briefs and their views: My briefs.
Every notice posted under solicitation 36C24226R0018 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
enced project under a new construction contract. To support this effort, the VA has directed Premier Engineering Group, Inc. to revise the existing contract documents and assemble a comprehensive construction bid package, titled Design-Build RFP, covering all remaining scope items. I. Design-Build Package The selected contractor shall retain Premier Engineering Group, Inc. (439 US-46, Rockaway, NJ 07866 | Tel: 973-586-3004) to develop the full Design-Build Package, including all drawings and specifications. Bidders must coordinate directly with Premier Engineering to obtain the associated A/E design fee, which must be included in their bid proposal. II. Phase 1 Area B (4th Floor) Area B construction is substantially complete, with only minor remaining work required across all trades. The scope includes installing scheduled furniture and equipment, completing architectural and MEP punch-list items, and integrating medical equipment. Notably, medical booms will be installed in four rooms, along with engineered ceiling support structures. AHU-1 has been installed, and the ductwork has been connected; the contractor is responsible for unit startup and performance verification in accordance with the design documents. Key tasks include: Temporary protection and infection control measures Installation of medical booms, ceiling support structures, and med gas piping Selective replacement of interior finishes New glass film finished in Room 4-100 Completion of MEP punch-list items Replacement of lighting fixtures in Room 4-115 with LEDs New roof-mounted exhaust fan and ductwork (with associated electrical) in Room 4-107 Airflow balancing of all supply diffusers and return/exhaust grilles Installation of reheat steam coils and temperature sensors for select CV boxes Replacement of outdated lighting controls to meet VA standards Provide and install additional power and data outlets Electrical wiring for medical booms Plumbing for missing or relocated fixtures Mechanical commissioning and final balancing for all existing equipment III. Phase 2 Area A (4th Floor) Phase 2 involves extensive interior construction across all disciplines. While demolition is mostly complete, much of the area remains in a rough-in condition, with exposed framing, unfinished finishes, and partially installed MEP systems. The AC-5 unit has not been installed; the contractor must provide and install the two missing sections. Major scope items include: Completion of partitions and gypsum board Installation of acoustic ceilings, lighting, doors, and hardware Millwork, painting, flooring, and other finishes New ductwork, grilles, diffusers, CV boxes, and controls Provide and install a new roof-mounted exhaust fan and ductwork (with associated electrical) serving Areas A & B Installation of new AC-5 ductwork Full electrical fit-out, including lights, controls, power, data, and fire alarm. Installation of new sprinkler heads and piping for all fixtures Plumbing piping for all new plumbing fixtures IV. Phase 2 Mechanical Room (5th Floor): The existing AC-5 unit shall be removed and replaced with a new unit. The contractor shall connect all steam, chilled water, drain piping, and electrical services, as well as modify or replace associated ductwork and controls. Additionally, new high-pressure steam lines shall be installed with PRV stations to convert to medium pressure, serving the existing 5th-floor air handling systems. Ensure the AHU 1 and AC-5 have cooled all year round for the off-season load. Tie in to both the 250-ton and the Primary chiller.� Connect AHU-1 and AHU-5 to the 250-ton and Primary chiller, and provide details/design and design-build work to ensure year-round cooling. General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labelling, commissioning, and site visit necessary to perform the site preparation. At a minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirements. Additional information can be found in the VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26 : The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawings, rigging, permits, commissioning, and site visits necessary to perform the site preparation. At a minimum, the following shall be performed: The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out electrical power boxes that supply power to the unit. The Contract shall provide and install all electrical and piping connections by certified technicians in their trades. The Contractor shall test and verify all work to ensure proper operation. The Contractor must have OSHA training and specialized OSHA training. In the performance of all work, the workers must be in compliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer s warranty that will exceed the one-year warranty the Contractor offers. A document shall have at a minimum the company, phone number, and the address where the government can obtain the manufacturer's information for an extended warranty. It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting. The Contractor shall always provide an English-speaking working supervisor on-site when work is being performed and for the duration of this project. Supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc. The Contractor shall post visible required warning signs and barriers prior to beginning any work. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government. The Contractor shall be responsible for the proper and safe removal and disposal of all debris. Contractors shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. VA Directive 0063 requires 50% of waste to be prevented or recy
14 award notices on SAM.gov in the last 24 months. Matched by: Same office (242-NETWORK CONTRACT OFFICE 02 (36C242)), same product/service code (PSC) Z1DA and NAICS 236220.
Single-winner award sizes (14): middle half $944K to $11.2M, median $2.6M; range $99K to $45.6M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| SERVIAM CONSTRUCTION LLC | 2 | $17.4M | Jul 11, 2025 |
| IRON SWORD ENTERPRISES, LLC | 2 | $1.7M | Mar 30, 2026 |
| Amerifield JV LLC | 1 | $45.6M | Aug 28, 2025 |
| CDEEM CO ORLANDO 32825 FLK | 1 | $22.9M | May 1, 2025 |
| WAINSCHAF ASSOCIATES, INC. | 1 | $13.3M | Jun 30, 2026 |
| DMYLES INC. | 1 | $5.1M | Oct 28, 2026 |
| F & C GROUP JV LLC | 1 | $3.9M | Apr 8, 2026 |
| PATRIOT SONS USA LLC | 1 | $2.5M | Jul 29, 2025 |
| TACTICAL CONSTRUCTION, INC | 1 | $2.5M | Aug 5, 2025 |
| VETERANS HOPE ASSOCIATES INC | 1 | $890K | Sep 23, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
None of these past winners filed lobbying reports naming Veterans Affairs, Dept of (VA) since 2024. No sign of an incumbent lobbying push at this agency.
No lobbyist on these filings lists a past Veterans Affairs, Dept of (VA) job: no revolving-door tie found in these filings. (These are lobbyists the companies pay, not their own staff.)
None of these winners matched a listed company, so PAC and FARA checks did not run.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
No bills named on these filings under Veterans Affairs-related issues.
A bill's title is shown only when the filing's own text names it; filings often cite last Congress's bill numbers.
No executive order in the last 12 months names Veterans Affairs in its title or summary.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
None of the past winners matched a listed company.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.